Skip to content
Web Ctrl A
العربية

Websites

Digital Annual Report Production: Stages From Data to Launch

Web Ctrl A Editorial Team · Published · 6 min read

Short answer

A digital annual report moves through clear stages: agreeing the scope, receiving approved content and data, designing the pages, building the microsite, reviewing it in both languages, and launching. Each stage depends on the one before it, and the biggest delays usually come from content that is not yet approved.

Why the order matters

Producing a digital annual report is not one task but a chain. Design cannot be final until the text is approved, charts cannot be built until the data is final, and the launch cannot happen until both languages have been reviewed. Seeing the chain early helps every team know what it owes the others and when.

We deliberately describe stages and dependencies here, not timings. The schedule of a real project depends on the size of the report and on when your content is approved, and it is set in the written quote.

The stages and what each depends on

Stages of producing a digital annual report
StageWhat happensDepends on
1. ScopeSections, charts, languages and downloads are agreed and quoted in writingYour answers to the scope questions
2. Content and dataApproved text and the data files behind every chart are handed overSign-off by management, finance and the auditors
3. Page designArabic and English page designs are prepared in Figma and approvedThe approved content and your brand files
4. BuildThe microsite, charts with data tables, search and downloads are builtThe approved designs
5. ReviewBoth languages are checked on phones and desktops, with keyboard and screen reader checksThe final text in both languages
6. Launch and handoverThe site goes live on the agreed hosting, with short documentationFinal approval from your named approver

Where projects usually get stuck

  • Text still changing after design has started, which means pages are redone.
  • Numbers that differ between the spreadsheet and the narrative, which have to be reconciled by the owners of the data.
  • A second language that is translated late, so the Arabic and English pages cannot be reviewed together.
  • Several approvers giving conflicting comments, with no single person deciding.

How to keep the chain moving

Name one approver and one person who collects comments. Freeze the text of each section once it is approved and route later changes through one channel. Hand over the data as spreadsheets, not images. The design brief guide lists what to send, and the printable scope checklist helps you settle the scope questions in stage one.

What each team does along the way

  • Finance and governance: supply approved figures and text, and answer questions about the data.
  • Communications: coordinates comments, approves the wording and chooses the photographs.
  • The design and build team: turns the approved content into pages, charts and downloads, and reports anything that looks inconsistent.
  • Management: gives the final approval at the points that matter, such as before the build and before launch.

Where approvals sit

Approvals are cheapest when they happen before the work they affect. The scope is approved before design, the content before page design, the page designs before the build, and the finished site before launch. Each approval closes a stage, so a change after it is a deliberate decision, not an accident.

When something changes after approval

Changes happen: a figure is restated, a paragraph is rewritten, a photograph is replaced. What matters is that each change goes to the named coordinator, is checked against its dependants, such as a chart, a table and the matching Arabic or English text, and is approved once. A change that is applied in one language and forgotten in the other is the most common source of inconsistency in a bilingual report.

Two languages, one chain

In a bilingual report, the stages run twice in step. The Arabic and English page designs are prepared together, both texts must be final before the build, and both editions are reviewed in the same stage. If one language is approved late, it holds up the whole chain, so it is worth agreeing at the start who approves each language and what happens if one is not ready.

The same applies to downloads. The PDF and the Excel files are produced from the final content, so they come after the text and the data are approved, not before.

After launch

After publication, text or numbers can be corrected on their own pages at the same address. Our team makes updates at your request under a written quote. You can read more about the service itself on the interactive annual report design page.

Want help with this?

Tell us about your project and our team will get back to you.

Book a consultation